Construction Update!

The construction fence will take up a majority of the stadium reserved parking lot, so the stadium reserved parking lot will not be available for parking or any vehicular traffic during construction. A wide path will be left open for foot traffic between the stadium and the construction fence.
 
Construction vehicles and equipment will have access to Bulldog Stadium Drive (bus lane from 963 to Third Street) and traffic on Bulldog Stadium Drive may need to be stopped at times. Traffic stoppages will be limited to the window of time between 8:15 a.m. and 2:30 p.m. We ask that staff, parents, and students limit their use of Bulldog Stadium Drive during the construction to avoid traffic stoppages.
 
Whether construction is or isn’t taking place, we want to remind everyone of the importance of maintaining a safe speed on Third Street and on Bulldog Stadium Drive, especially with the addition of construction vehicles to the mix of existing, staff, parent, and student traffic.